Six dental offices since 2023

Prime Renovations has built or renovated six dental offices in the Baltimore area since 2023: three full build-outs, a four-operatory renovation, and two smaller jobs inside working practices. Practice names and addresses are left out here; references are available on request.

A nine-treatment-room practice in Glen Burnie (2025–2026). An existing office space, about 3,600 square feet inside a 4,775-square-foot building, became an outpatient dental clinic: nine treatment rooms including a private room, a CT imaging room, a consultation room, a dental lab, a sterilization room, reception and waiting, two offices, a staff lounge and an equipment room. Dental air and vacuum lines run below the slab to the equipment room; the electrical work covered under-slab chair conduits and circuits for the chairs, 12-o'clock cabinets and X-ray units. The architect, the engineers, the equipment supplier, the cabinetry fabricator, the electrical and plumbing trades and the county inspectors all had to be kept in step, and the records show the usual friction of a job this size: a lab countertop measured wrong and remade, missing filler panels and sink parts, compressor and vacuum commissioning, and two rooftop HVAC economizers the county required before final approval. Permit drawings were signed at the end of August 2025; the county issued the certificate of occupancy in September 2026.

A six-treatment-room office in Essex (2023–2025). A 1,825-square-foot unit in a retail center, with an existing sprinkler system and ten-foot ceilings, laid out from the equipment supplier's schematic: six treatment rooms, sterilization, a position for panoramic imaging, reception, a business office, a manager's office, the doctor's office, storage, IT, janitorial and restrooms. The work ran from plumbing rough-in and commercial framing through doors, cabinetry, flooring and finishes. The sprinkler system had to be altered around the new layout, with access arranged through the neighboring tenants, and the rooftop HVAC unit was replaced, which brought a gas-pressure question that had to be settled with BGE. Construction ran through 2024; the county's use-and-occupancy approval came in June 2025.

A first-floor dental suite in Park Heights, Baltimore (2023–2024). Plumbing, electrical, HVAC, framing, doors, cabinetry and flooring for a dental suite on the ground floor of a multi-unit building. The piece that needed the most care was a new exterior door where a 36-inch basement window had been: the opening was in 8-inch block under a lintel made of two steel angles, so a structural engineer evaluated the lintel, specified temporary support and solid-masonry jambs, and the building's board approved the doorway on the strength of that letter.

A four-operatory renovation in northeast Baltimore County (2024). New cabinetry in four operatories and the lab, flooring, lighting and finishes for a family and pediatric practice, done in a few weeks in late summer.

Two smaller jobs inside working practices. A suite in White Marsh got new carpet and glue-down flooring, baseboards and paint over several weeks in 2023, and a dental office in northeast Baltimore had repairs and interior improvements spread over a few months in 2025.

What a dental build-out involves

Plumbing under the slab. Each operatory needs water, drain, compressed air and vacuum lines, usually run beneath the slab to a mechanical room that holds the compressor and vacuum pump. The slab is cut and trenched before anything else happens, so the operatory layout has to be final early.

Electrical. Chairs, lights, imaging and sterilizers each want their own circuits, and a panoramic or CBCT unit wants a dedicated one. Older retail and office spaces often need a panel upgrade.

Imaging rooms. Depending on the equipment and the room, the walls around X-ray and CBCT units may need lead shielding, and X-ray machines are registered with the Maryland Department of the Environment's Radiological Health Program before use.

Sterilization. A sterilization center laid out from dirty to clean, with the counter space, sinks and power the equipment requires.

Air. Dental suites need more air changes than a standard office, and the mechanical room produces heat; the HVAC design has to account for both.

Wastewater. Practices that place or remove amalgam need an amalgam separator under the EPA's dental effluent rule.

Accessibility and finishes. ADA-compliant routes, restrooms and reception, and flooring and wall finishes that stand up to daily disinfection.

Permits and inspections. Building, plumbing, electrical and mechanical permits; fire-alarm and fire-marshal inspections; in Baltimore County, a change-of-occupancy review for health-care use; and the certificate of occupancy at the end. Our dental build-out guide goes into the Maryland rules in more detail.

How a dental project runs

  1. Walk the space before you sign the lease. We look at the slab, ceiling height, panel capacity, water service and where plumbing can run. Some spaces cost far more to convert than others, and that is better known before the lease.
  2. Build to your equipment supplier's drawings. Patterson, Henry Schein, Benco and other suppliers produce the operatory layout and utility requirements for the chairs and units you choose. We build to those specifications and coordinate installation dates with your rep.
  3. A written pro-forma estimate with line items, allowances and assumptions, before the design is final. How we estimate.
  4. Design, engineering and permits.
  5. Construction. If you are renovating a working practice, we phase the work so you keep seeing patients where possible.
  6. Closeout. Inspections, certificate of occupancy and the punch list.

What dental build-outs cost and how long they take

On our own projects, a full dental build-out of 1,800 to 3,600 square feet has run between about $220,000 and $300,000 in construction cost, roughly $80 to $120 per square foot, and about a year from signed permit drawings to certificate of occupancy; approvals, equipment deliveries and inspections can stretch that. A renovation of four operatories in a working practice took six to eight weeks. A finish refresh of a suite, with new flooring, baseboards and paint, ran a few weeks. These figures cover construction only; dental equipment and chairs are bought separately through your supplier, and furniture, signage and IT are not included.

Where we work

We work in Baltimore City and Baltimore, Howard, Anne Arundel and Carroll counties. Recent dental projects were in Glen Burnie, Essex, White Marsh, Park Heights and northeast Baltimore County.

Common questions

What does a dental office build-out cost in Maryland?

On Prime's recent projects, full build-outs of 1,800 to 3,600 square feet cost about $220,000 to $300,000 for construction, roughly $80 to $120 per square foot. The slab plumbing, the electrical capacity of the space and the number of operatories drive most of the difference. Equipment is separate.

How long does a dental build-out take?

Plan on about a year from signed permit drawings to certificate of occupancy for a full build-out; approvals, equipment deliveries and inspections can add to that. A renovation of existing operatories can be done in six to eight weeks, and a finish refresh takes a few weeks.

Can my practice stay open during a renovation?

Often, yes. We phase operatory and finish work so part of the office keeps running and schedule the noisiest work around your patient hours. A build-out of a new space does not affect your current office at all.

Who coordinates the dental equipment?

Your equipment supplier's rep designs the operatory layout and specifies the utilities. We build to those drawings and coordinate the installation date; chairs and units arrive after construction is complete.

Do I need lead-lined walls?

It depends on the equipment and the room. Shielding is designed for the specific units and layout, and a shielding evaluation determines what, if anything, the walls need. X-ray machines are registered with the Maryland Department of the Environment's Radiological Health Program.

Is an amalgam separator required?

For most dental offices that place or remove amalgam, yes, under the EPA's dental effluent guidelines (40 CFR Part 441).

Which permits and inspections are involved?

A building permit with plumbing, electrical and mechanical trades; fire-alarm and fire-marshal inspections; in Baltimore County, a change-of-occupancy review for health-care use; and a certificate of occupancy at the end.

Sources

  1. Maryland State Board of Dental Examiners
  2. U.S. EPA — dental effluent guidelines (amalgam separator rule, 40 CFR Part 441)
  3. Maryland Department of the Environment — Radiological Health Program (X-ray registration)
  4. Baltimore County — change of occupancy permit (healthcare, assisted living and food service reviews)
  5. U.S. Department of Justice — 2010 ADA Standards for Accessible Design
  6. Facility Guidelines Institute — Guidelines for Design and Construction of health care facilities

Reviewed by Rodney Hakimi, MHIC #143153 · Published November 9, 2026